Sagamore Parkway bridge demolition

Sagamore Parkway Eastbound Bridge demolition July 12, 2016.

Today, July 12th, 2016, one of the road bridges, over the Wabash River, was demolished, using explosives. This is the latest phase in the reconstruction project, of the bridge carrying the east bound carriageway of Sagamore Parkway, formerly US52, from West Lafayette to Lafayette, Indiana.

River Road, Old State Road 43, which is situated next the Wabash River, and passes under the bridge, has been closed from Monday July 11, 2016, for approximately one month.

Traffic from the east bound bridge has been diverted onto the other, west bound bridge, temporarily. The deck had previously been stripped off of the bridge framework, and the most easterly span was removed, before the framework was demolished, at approximately 9AM, on the 12th. Crews have been given 24 hours to remove the debris from the river.

The east bound bridge is situated south of the west bound bridge, and was constructed in 1936, and is therefore older than the west bound bridge. The two bridges are of completely different designs.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s